_project management

_a project manager is a person whose job is to plan a piece of work or activity and organize the work of all the people involved in it _ moreover, project management is the activity of organizing and controlling a project_

_project management requires skills not so easy to gain _ fortunately, my luck brought me to Hungary’s greatest development project in the last 150 years _ this project is Liget Budapest which aims to revitalize one of the hugest parks in Budapest and to create a world wide known tourist destination involving museums and concert halls for example_

_my duties were in this tremendous project_

_supervision the New National Gallery’s design process (54 000 m2)

_coordination between 10 designer teams, including SANAA and Sou Fujimoto Architects

_developing the Masterplan of Liget Budapest (total area 911,412.13 m2)

_direction the Liget Budapest’s Accessibility Concept


_supervision of New National Gallery_

_designer _ SANAA & B+H Consortium

_function _ museum and conference center

_size _ ~54 000 m2

_duties _ representing Client’s requests and control the design process according to engineering

_coordination between Liget Budapest’s co-designer groups_

_designers _ e.c. SANAA & B+H Consortium, Sou Fujimoto Architects, Garten Studio, NARMER Architecture Studio, Napur Architects, Mérték Studio

_quantifies _ 8 separated big building, 1 huge park, connecting utilities and infrastructure

_size _ 911 412.13 m2

_duties _ connecting the designer teams due to their shared design area, exploring the problems between them, and trying to give a proper solution to the decision maker

_developing the Masterplan of Liget Budapest_

_meaning _ surface plan and register map of Liget

_function _ control the indicators of surfaces (e.g. green area) and future operating tool and map

_size _ 911 412.13 m2

_duties _ creation of original situation, studies of possible future scenarios, construction of information request method from designer teams, importing the future buildings’ data, controlling the whole area in the meaning of indicators according to regulations (green area, maximum built-in area, etc.), preparation of Park designer to continue the work, help to Park designer with any problems regarding the Masterplan

_direction of Liget Budapest’s Accessibility Concept_

_designers _ REHABEXPERT Comp_

_regarding _ all buildings, whole park, signage_

_co-disciplines _ architecture, infrastructure, fire controlling, BREEAM, Equal Opportunities of Persons with Disabilities Non-profit Ltd. (FSZK)_

_duties _ creation, coordination and management the accessibility concept from the very beginning to the end regarding all of he sub-projects of Liget Budapest as a project manager and a writer_